HZS series commercial concrete batching plant is a full set of concrete mixing equipment, including the following parts: concrete mixing system, aggregate batching and weighing system, cement weighing system, water weighing system, additive weighing system (optional), cement silo, screw conveyor, full automatic control system, etc.
If using HZS series commercial concrete mixing plant, it is suggested that the user should choose a suitable concrete mixer. HZS series commercial concrete batching plant requires a pump truck, which is also called concrete pump. Haomei HZS series commercialconcrete batching plant is ideal equipment to produce commercial concrete. It is widely used for water conservancy, electric power, railroad, road, tunnel, the arch of bridge, national defense project, etc.. Our main products are as follows: concrete batching plant, electric portable concrete mixer, small concrete mixers, forced type concrete mixers, etc. Welcome to visit our factory and our machine!
2015年12月18日星期五
2015年12月17日星期四
About the operating parameters of trailer concrete pump
Take a small pump mounted on the special chassis made without cab and can move on their own by a wireless remote control small range at the construction site, when long distance transitions, the ability to pull a fast then transported by tractor-trailers, is a set of self-propelled, pumping, fabric functions in one efficient concrete conveying equipment. The device is compared with the pump, with a high cost. Control system hardware configuration to improve diesel transfer
Precision speed control, stepper motor drive throttle bodies, there is the difference between the use of closed-loop control diesel engine speed. Operation of the entire device, wireless remote control-based, supplemented by close control, wireless remote control function pumping operations, boom fabric job, the main oil pump displacement control, pump operations, such as walking on their own. By text display, you can display the working status towed boom pump and related operating parameters, adjust the relevant control parameters.
(1) Power section, DC 24V, negative grounding system, powered by 24V160Ah battery, diesel engine generators allow built-in power supply.
(2) Power section, vehicle powered by V () I, V () PEN-TA Company TAD721 VE engine, rated power / speed of 195kW / 2300r / min. Throttle adjusted by 57H41-2.7-001 stepping motor, the HA335 high performance stepper drives the entire half-step drive.
(3) PLC part, Siemens 57-200 series of economic micro PLC, the CPU224DCDCDC host controller and four EM223DCRLY expansion modules, input 46 points and output 42 points. Realization engine speed detection and adjustment, electro-proportional main pump displacement control, receiving control signals from various sensors, switches and wireless remote control for towed boom pump program control.
(4) Wireless Remote Control section, use Hyde (Hetronic) produced by BMS-2 wireless remote control, remote control receiver 6 group PWM outputs, 12 digital output, control towed boom pump pumping, cloth and go on their own.
(5) The text display unit, Siemens TD- 400 text display, with Q PLC them with PPI protocol communications, to complete the work status display, parameter adjustment and related auxiliary control.
Precision speed control, stepper motor drive throttle bodies, there is the difference between the use of closed-loop control diesel engine speed. Operation of the entire device, wireless remote control-based, supplemented by close control, wireless remote control function pumping operations, boom fabric job, the main oil pump displacement control, pump operations, such as walking on their own. By text display, you can display the working status towed boom pump and related operating parameters, adjust the relevant control parameters.
(1) Power section, DC 24V, negative grounding system, powered by 24V160Ah battery, diesel engine generators allow built-in power supply.
(2) Power section, vehicle powered by V () I, V () PEN-TA Company TAD721 VE engine, rated power / speed of 195kW / 2300r / min. Throttle adjusted by 57H41-2.7-001 stepping motor, the HA335 high performance stepper drives the entire half-step drive.
(3) PLC part, Siemens 57-200 series of economic micro PLC, the CPU224DCDCDC host controller and four EM223DCRLY expansion modules, input 46 points and output 42 points. Realization engine speed detection and adjustment, electro-proportional main pump displacement control, receiving control signals from various sensors, switches and wireless remote control for towed boom pump program control.
(4) Wireless Remote Control section, use Hyde (Hetronic) produced by BMS-2 wireless remote control, remote control receiver 6 group PWM outputs, 12 digital output, control towed boom pump pumping, cloth and go on their own.
(5) The text display unit, Siemens TD- 400 text display, with Q PLC them with PPI protocol communications, to complete the work status display, parameter adjustment and related auxiliary control.
Small concrete pump truck FAQ
Now, in construction on the pump is an irreplaceable role in the. Here is truck driver in the operation often encounter a variety of problems, here HAOMEI Machinery equipment Co., Ltd. Star-ming will provide you with answers to frequently asked questions:
1, pump arm fast how slow the point?
You can adjust the parity above multi-way valve orifice screw, thereby regulating the flow sheet valve, to regulate the speed of the purpose of the boom. Manufacturers do not recommend you to adjust the relevant buttons.
2. Pump Truck shaking too much how to deal with?
Inside the cabinet to turn off the boom cushioning effect but little more, or adjust the boom position and then put a small displacement or more, as the legs firmly support some, the problem itself steel boom.
3, how to lift GPS lock boom pump?
If you do not pay the car models are recommended on schedule or not lifted, manufacturers know very troublesome. If you have already paid the car models it can only be modified electronic control of the whole, not computer controlled.
4, concrete pump truck pumped back why not?
Concrete pump can not be pumped to the car, although the turntable can take 365-degree rotation of the boom can be turned back, but the center of gravity in the truck behind the car, back after pumping more rearward center of gravity mobile, the risk of rollover-prone, it is not pumped back! This situation can be put down to drive around a little on it.
5, the general construction of concrete pump require much space?
Almost to a diameter of 12 meters of space to be conducive to the smooth terrain it additional pump, next have to have a space for a U-turn mixer. But in general depends on the width of the front legs and rear legs, pumping the length of the pump is not the same. Secondly Also note that there is no space above obstacles such as wires, finally, to ensure the normal and depart into the concrete mixer, preferably have two venues car the car will meet the above requirements on it.
1, pump arm fast how slow the point?
You can adjust the parity above multi-way valve orifice screw, thereby regulating the flow sheet valve, to regulate the speed of the purpose of the boom. Manufacturers do not recommend you to adjust the relevant buttons.
2. Pump Truck shaking too much how to deal with?
Inside the cabinet to turn off the boom cushioning effect but little more, or adjust the boom position and then put a small displacement or more, as the legs firmly support some, the problem itself steel boom.
3, how to lift GPS lock boom pump?
If you do not pay the car models are recommended on schedule or not lifted, manufacturers know very troublesome. If you have already paid the car models it can only be modified electronic control of the whole, not computer controlled.
4, concrete pump truck pumped back why not?
Concrete pump can not be pumped to the car, although the turntable can take 365-degree rotation of the boom can be turned back, but the center of gravity in the truck behind the car, back after pumping more rearward center of gravity mobile, the risk of rollover-prone, it is not pumped back! This situation can be put down to drive around a little on it.
5, the general construction of concrete pump require much space?
Almost to a diameter of 12 meters of space to be conducive to the smooth terrain it additional pump, next have to have a space for a U-turn mixer. But in general depends on the width of the front legs and rear legs, pumping the length of the pump is not the same. Secondly Also note that there is no space above obstacles such as wires, finally, to ensure the normal and depart into the concrete mixer, preferably have two venues car the car will meet the above requirements on it.
The reason of small concrete pump truck oil temperature too high
We use a small concrete pump to work when sometimes encounter the oil temperature rise quickly, very high, and it was found unable to pump commutation failure to solve this problem we must first analyze its reasons, experienced drivers master should be aware that this situation is mostly caused by the hydraulic system leak. Well, we are going to talk about it on the specific troubleshooting methods:
We can check the hydraulic pressure of the oil outlet for this failure, if pressure is normal on the import and export and then measuring the accumulator pressure, if the pressure is low, then the accumulator air bag has been broken, replace the accumulator If the test machine fault still exists, you can check the oil between the pump and the accumulator, since between the pump and the accumulator is not compromised,Therefore only possible within the one-way valve between the pump and the accumulator vent lead to temperature rise, reversing weakness. Just down within a period of time, be able to hear the pressure oil unloading "hissing" sound, you can open a one-way valve, you will find the sealing surface of the valve is badly worn, and the hydraulic oil cloudy, with a slight emulsification. You can now replace the check valve and hydraulic oil after the test machine, you can find Tuobeng return to normal.
The current small pump products, most with a 1-2 or hydraulic oil table, a whole oil, a branch table. Then with the oil temperature table, when found in the mailbox of the hydraulic oil increases, often need to determine the cause of the failure to use the above exclusion, despite the exclusion of time required is also not a lot. But at the construction site, as early as one minute if you can solve the problem, the construction unit, is to reduce the losses and increase the benefits.
We can check the hydraulic pressure of the oil outlet for this failure, if pressure is normal on the import and export and then measuring the accumulator pressure, if the pressure is low, then the accumulator air bag has been broken, replace the accumulator If the test machine fault still exists, you can check the oil between the pump and the accumulator, since between the pump and the accumulator is not compromised,Therefore only possible within the one-way valve between the pump and the accumulator vent lead to temperature rise, reversing weakness. Just down within a period of time, be able to hear the pressure oil unloading "hissing" sound, you can open a one-way valve, you will find the sealing surface of the valve is badly worn, and the hydraulic oil cloudy, with a slight emulsification. You can now replace the check valve and hydraulic oil after the test machine, you can find Tuobeng return to normal.
The current small pump products, most with a 1-2 or hydraulic oil table, a whole oil, a branch table. Then with the oil temperature table, when found in the mailbox of the hydraulic oil increases, often need to determine the cause of the failure to use the above exclusion, despite the exclusion of time required is also not a lot. But at the construction site, as early as one minute if you can solve the problem, the construction unit, is to reduce the losses and increase the benefits.
How to Maintenance the key parts of small concrete pump truck
Small concrete pump as the primary machinery of its construction machinery and equipment efficiently popular market, in the size of the project site can be seen in its presence. But for the construction work of high intensity, small truck with the increased use of time prone to various losses and failures, so weekdays maintenance is critical, especially the core components, critical parts of the maintenance is particularly important!
Small concrete pump truck as the current much welcomes the concrete construction machinery and equipment, which several key parts of the pump accessories should particularly pay attention to, such as manual grease pumps, lubricating oil cup, concrete pistons, arm, leg and so on weekdays to pay more maintenance. Now for several key parts of the maintenance work, each row of concrete were introduced:
Manual grease pump
After pumping before the end of each boot and you want to clean the vehicle, and then check and maintain grease filled manual grease pump storage tanks inside, pulling the grease pump handle, observe stirred bearing, S tube size spindle head place, if you can have a clean, grease overflows. In the course of their work should be pulled manually every hour on the grease pump handle 10 times. While maintaining a clean lubrication system to prevent dust and other contaminants from entering, do not contact with acid substances while working 500 hours each time cleaning the system.
cups oil lubrication
Two swing seat valve cylinders, each with a lubricating cup. Before pumping begins, it must fill up the grease into the oil cup and capping grease lubrication. Operation, should cap Lubricate every four hours, so that the spherical friction surface in good lubrication condition.
arm, leg and table maintenance
At the hinge point of the concrete pump truck boom sections, the four legs of the connecting shaft and bearing and turntable designed several positions butter mouth, usually required every 60 working hours to lubrication points (grease fittings) oil . It should normally be fully lubricated with grease until oil overflows.
Small concrete pump truck as the current much welcomes the concrete construction machinery and equipment, which several key parts of the pump accessories should particularly pay attention to, such as manual grease pumps, lubricating oil cup, concrete pistons, arm, leg and so on weekdays to pay more maintenance. Now for several key parts of the maintenance work, each row of concrete were introduced:
Manual grease pump
After pumping before the end of each boot and you want to clean the vehicle, and then check and maintain grease filled manual grease pump storage tanks inside, pulling the grease pump handle, observe stirred bearing, S tube size spindle head place, if you can have a clean, grease overflows. In the course of their work should be pulled manually every hour on the grease pump handle 10 times. While maintaining a clean lubrication system to prevent dust and other contaminants from entering, do not contact with acid substances while working 500 hours each time cleaning the system.
cups oil lubrication
Two swing seat valve cylinders, each with a lubricating cup. Before pumping begins, it must fill up the grease into the oil cup and capping grease lubrication. Operation, should cap Lubricate every four hours, so that the spherical friction surface in good lubrication condition.
arm, leg and table maintenance
At the hinge point of the concrete pump truck boom sections, the four legs of the connecting shaft and bearing and turntable designed several positions butter mouth, usually required every 60 working hours to lubrication points (grease fittings) oil . It should normally be fully lubricated with grease until oil overflows.
Concrete Pump operation and maintenance precautions
About concrete pump , although there are certain understanding, but in order to help some of the small truck operation and maintenance precautions have puzzled friend, haomei machinery equipment co.,ltd for everyone here briefing points to note:
1. First of all, we need to know, we need to To actively carry out regular inspection and maintenance, but also do routine maintenance of science in this context. This is also to ensure that the first condition of our work and personal security.
2.Try to clean , because the concrete in a short time settable agglomeration, so we must pay attention to during transport to maintain its initiative, even after the completion of work to do cleanup work transport will be stuck inside the concrete tank clean and prevent corrosion of its body.
3, washed with water before loading the material inlet is maintained at the feed inlet moist. At the same time also comes with the vehicle wash water tank filled with water; even after the completion of the loading of the inlet to wash, wash the residue in the vicinity of the inlet of concrete;
4, to the site after discharge, wash out the tank, then into the concrete wash water tank plus 30-40 L; holding concrete tank slowly rotate forward when the vehicle return;
5, every day thorough cleaning tanks and knock off the surrounding concrete material inlet and outlet, ensure stick cement and concrete caking.
Haomei Machinery Equipment Co.,Ltd offers a variety of concrete machineries, We mainly offer engineering concrete mixing plants, commodity concrete mixer, concrete pump, concrete batching plant and other concrete plants, welcome to order and visit our company!
1. First of all, we need to know, we need to To actively carry out regular inspection and maintenance, but also do routine maintenance of science in this context. This is also to ensure that the first condition of our work and personal security.
2.Try to clean , because the concrete in a short time settable agglomeration, so we must pay attention to during transport to maintain its initiative, even after the completion of work to do cleanup work transport will be stuck inside the concrete tank clean and prevent corrosion of its body.
3, washed with water before loading the material inlet is maintained at the feed inlet moist. At the same time also comes with the vehicle wash water tank filled with water; even after the completion of the loading of the inlet to wash, wash the residue in the vicinity of the inlet of concrete;
4, to the site after discharge, wash out the tank, then into the concrete wash water tank plus 30-40 L; holding concrete tank slowly rotate forward when the vehicle return;
5, every day thorough cleaning tanks and knock off the surrounding concrete material inlet and outlet, ensure stick cement and concrete caking.
Haomei Machinery Equipment Co.,Ltd offers a variety of concrete machineries, We mainly offer engineering concrete mixing plants, commodity concrete mixer, concrete pump, concrete batching plant and other concrete plants, welcome to order and visit our company!
2015年12月16日星期三
How to dismantl of small concrete pump boom system
After any mechanical device used for some time, there will be some natural wear and tear, or inexplicable failures. This time if the following situations, you may need dismantling of small concrete pump truck boom system.
1, small truck boom maintenance is not good, the pin and the copper liner wear serious, we need to replace the pin or jib boring;
2, connecting rod or pin transformation;
3, the replacement of a new boom.
The first step: a small concrete pump can not work unless it is, on the contrary are otherwise removed from the beginning of the last boom, when installed in order. The final forearm flat on the ground, and with good wood pad, penultimate section arm and arm into the required angle of 5-10 degrees, in order to avoid arm cylinder in extended or retracted extreme position.
1.a small pump this last boom cylinder on the compression balancing valve is opened to relieve pressure. Because it is high-pressure oil, so the relief time to pay attention:
Loosen the balancing valve pressure regulator, the attention to the original position be marked, or write down Loosen laps. If you need to remove the balancing valve shall be installed with a cloth face balancing valve and the cylinder block, to prevent high pressure oil discharged wounding.Use a hammer to the boom cylinder and linkage pin knocked out, hanging under the fuel tank. If the pressure relief valve has been removed, be careful not to spill.
2.the arm and the link pin to knock them out, slightly lift the penultimate section of the boom, the last section of the boom for demolition is completed.
3.Remove the copper sleeve, copper sleeve and the pin to be checked, if you need to replace worn.
4.Install boom and cylinders, pay attention to the pin direction.
5.If you previously removed a balancing valve, now need to install and adjust the dynamic balance valve pressure balance valve on the fuel tank, the pressure to return to the previous setting.
6.Start and begin operating the boom, boom see whether the firm or have no oil spill situation. Note: When operating the boom, the smallest possible margin, no person shall close the boom range of motion.
After these few steps, you can successfully dismantling of small concrete pump truck boom system.
1, small truck boom maintenance is not good, the pin and the copper liner wear serious, we need to replace the pin or jib boring;
2, connecting rod or pin transformation;
3, the replacement of a new boom.
The first step: a small concrete pump can not work unless it is, on the contrary are otherwise removed from the beginning of the last boom, when installed in order. The final forearm flat on the ground, and with good wood pad, penultimate section arm and arm into the required angle of 5-10 degrees, in order to avoid arm cylinder in extended or retracted extreme position.
1.a small pump this last boom cylinder on the compression balancing valve is opened to relieve pressure. Because it is high-pressure oil, so the relief time to pay attention:
Loosen the balancing valve pressure regulator, the attention to the original position be marked, or write down Loosen laps. If you need to remove the balancing valve shall be installed with a cloth face balancing valve and the cylinder block, to prevent high pressure oil discharged wounding.Use a hammer to the boom cylinder and linkage pin knocked out, hanging under the fuel tank. If the pressure relief valve has been removed, be careful not to spill.
2.the arm and the link pin to knock them out, slightly lift the penultimate section of the boom, the last section of the boom for demolition is completed.
3.Remove the copper sleeve, copper sleeve and the pin to be checked, if you need to replace worn.
4.Install boom and cylinders, pay attention to the pin direction.
5.If you previously removed a balancing valve, now need to install and adjust the dynamic balance valve pressure balance valve on the fuel tank, the pressure to return to the previous setting.
6.Start and begin operating the boom, boom see whether the firm or have no oil spill situation. Note: When operating the boom, the smallest possible margin, no person shall close the boom range of motion.
After these few steps, you can successfully dismantling of small concrete pump truck boom system.
订阅:
博文 (Atom)