Concrete Pump operation and maintenance precautions

About concrete pump , although there are certain understanding, but in order to help some of the small truck operation and maintenance precautions have puzzled friend, haomei machinery equipment co.,ltd for everyone here briefing points to note:
1. First of all, we need to know, we need to To actively carry out regular inspection and maintenance, but also do routine maintenance of science in this context. This is also to ensure that the first condition of our work and personal security.
2.Try to clean , because the concrete in a short time settable agglomeration, so we must pay attention to during transport to maintain its initiative, even after the completion of work to do cleanup work transport will be stuck inside the concrete tank clean and prevent corrosion of its body.
3, washed with water before loading the material inlet is maintained at the feed inlet moist. At the same time also comes with the vehicle wash water tank filled with water; even after the completion of the loading of the inlet to wash, wash the residue in the vicinity of the inlet of concrete;
4, to the site after discharge, wash out the tank, then into the concrete wash water tank plus 30-40 L; holding concrete tank slowly rotate forward when the vehicle return;
5, every day thorough cleaning tanks and knock off the surrounding concrete material inlet and outlet, ensure stick cement and concrete caking.